Wiehltalbahn (Wiehl Valley Railway)
Förderkreis zur Rettung der Wiehltalbahn

 

Toggle Navigation
  • Home
  • Latest News
  • The Wiehltalbahn
    • The Line
      • A Railway Ride Through The Wiehl Valley
      • The line between Hermesdorf - Morsbach
    • History Of The Wiehltalbahn
  • Tourism
    • Excursion Tips
    • Tourist Portal
    • Food & Drink
    • Walking in the 'Bergisches Land'
    • Cycling
    • Families
    • Our Recommendations
  • Society
    • The 'Preservation Society'
    • Preserving History
    • Shaping The Future
    • Donations
  • Contact Information
  • Legal Information

Select Language:

  • Deutsch
  • English (GB)

Wiehl Valley Railway Line: Freshly vacuumed and ballasted!

Written by Detlef Zirpel
Created: 20 March 2023

 At Easter, the steam train of the "Bergischer Löwe" finally is to steam over the Wiehl Valley Railway between Engelskirchen-Osberghausen and Wiehl again after the corona pandemic and the Bielstein bridge closure. For some time now, the active members of the Förderkreis zur Rettung der Wiehltalbahn e.V. have therefore been working on the line. Now, there was the unusual use of a two-way suction vehicle on the Wiehltalbahn.

Read more: Wiehl Valley Railway Line: Freshly vacuumed and ballasted!

Rehabilitation of the small trolley Skl 53

Written by Detlef Zirpel
Created: 06 February 2023

 The refurbishment of our Skl 53 work vehicle is another ongoing topic of our work. In the meantime, the reassembly of already refurbished and reconditioned components has begun...

Read more: Rehabilitation of the small trolley Skl 53

Rehabilitation of the railway bridge over the Wiehl in Bielstein

Written by Detlef Zirpel
Created: 06 February 2023

 According to our statement in the last annual report in December 2021, the renovation works on the railway bridge across the river Wiehl behind the Zunft-Koelsch brewery in Wiehl-Bielstein ("Zunftbrücke") had actually been completed in December 2021.

Read more: Rehabilitation of the railway bridge over the Wiehl in Bielstein

Timber loading at Osberghausen station

Written by Detlef Zirpel
Created: 06 February 2023

 Timber loading at Osberghausen station for the southern German sawmill continued in 2022, albeit on a smaller scale. continued in 2022, albeit on a smaller scale. Obviously the largest quantities of damaged timber from the Oberberg forests have already been transported away.

Read more: Timber loading at Osberghausen station

New feasibility study on the reactivation of the Wiehl Valley Railway - actual state of affairs

Written by Super User
Created: 06 February 2023

 While last year we had still expressed the hope that the commissioning for a new feasibility study for the reintroduction of regular passenger services on the Wiehl Valley Railway could take place in the first quarter of this year and that the first results of the study would be available before the end of the year, this hope has unfortunately vanished into thin air.

Read more: New feasibility study on the reactivation of the Wiehl Valley Railway - actual state of affairs

  1. Resumption of service in 2023 on the Wiehl Valley Railway
  2. Open Monument Day on September 11th, 2022
  3. Nearly 50,000 tonnes of beetle wood shipped from Osberghausen in 2021
  4. Rehabilitation of the Bielstein bridge largely completed

Page 2 of 11

  • 1
  • 2
  • 3
  • 4
  • ...
  • 6
  • 7
  • 8
  • 9
  • 10

Latest News

  • Pruning work on the Wiehl Valley Railway
  • Open Monument Day on September 10th, 2023, at Waldbröl Station
  • Special rides on August 26th and August 27th on the occasion of the reopening of the Wiehlpark
  • The "Bergischer Löwe" roared - and each and every one came...
  • Special trip in occasion of the reopening of the Bielstein bridge and the lower Wiehl Valley Railway as far as Wiehl

Rides & Events

View Full Calendar
Apr 20, 2025
10:30 AM - 05:24 PM
Opening trip with the steam train (possibly w. spare diesel locomotive) at the start of the 2025 season

  • You are here:  
  • Home

Back to Top

© 2025 Wiehltalbahn (Wiehl Valley Railway)